Electrical Permit Fee Schedule

FY 2012

Double fee for work started without a permit.  Minimum permit fee $50.00.

Administration Fee $50.00
Annual Electrical Contractor's Registration
$35.00
Minimum Permit Fee (minor repairs, etc.)
$35.00
Go to Top
Circuits
First $35.00
Each additional $5.00
First 2-pole circuits, for example range, oven, dryer, kiln $35.00
Each Additional 2-pole circuit $10.00
Go to Top
Electric Heat
First Room $50.00
Each Additional $25.00
Emergency Lighting (each)
Temporary Hook-Ups $50.00
Feeders, Buss Duct
First 100 feet $50.00
Each additional 100 feet $25.00
Go to Top
Fixtures
Includes emergency exit lighting, residential smoke detectors
First 25 $50.00
Each additional 25 $15.00
Go to Top
Fire Alarm/Suppression Systems (Refer to mechanical fees)
Up to 10 Units:  horns/strobes, smoke/heat detectors, pull station $100.00
Each additional unit $25.00
First Panel $50.00
Each Additional $25.00
Go to Top
Garages
Residential single circuit $35.00
Each additional $15.00
Sub-Panel and feeders $75.00
Go to Top
HVAC - Wiring only (combine with HVAC permit)
Commercial up to 5 ton $50.00
Commercial over 5 ton $75.00
Residential A/C $35.00
Furnace new or reinstall $35.00
Go to Top
Low Voltage Wiring
First 20 devices (per system) $50.00
21-200 devices $100.00
101-200 devices $150.00
over 200 devices $200.00
Go to Top
Motors/Transformers
Up to 10 HP/KVA $50.00
11 to 50 HP/KVA $75.00
Over 50 HP/KVA $100.00
Each Additional $50.00
Go to Top
Plan Review - Refer to Building Permit Fee Schedule
Refer to Building Permit Fee Schedule
Services and Sub-Panels
Up to 150 AMPS (including interruptible) $75.00
151-400 AMPS $100.00
401 AMPS and over $200.00
Temporary construction up to 200 AMPS $75.00
Temporary construction over 200 AMPS $100.00
Primary Service $100.00
**(Must include ground rod, water meter and water system and roof riser)
Go to Top
Signs
First Connect/Reconnect $50.00
Each additional sign or circuit $35.00
Go to Top
Transfer Switch
  $50.00
Go to Top

Cancellation and/or Refunds

Upon written request and prior to commencement of any work, permits may be cancelled and refunded to the holder.  The permit fee less 50%, or a minimum of $50, will be refunded.  The balance will be retained by the City of Ferndale to defray administrative costs.

In cases where the work has commenced and a request is received to transfer a permit to another contractor, a minimum fee of $50 shall be charged for the transfer to defray administrative costs.  Additional fee amounts will be determined by actual documented administrative costs.

 

 

Government  |  Services  |  Community  |  Business  |  Resources 
Job Announcements  |  Home  |  Site Map  |  Search

The City of Ferndale, Michigan
300 East Nine Mile Road
Ferndale, Michigan  48220
(248) 546-2525
City Hall Hours:
Monday - Thursday 8:00am - 5:30pm
Closed Fridays

 

Click here to send your feedback to the City of Ferndale.

This page last modified 04/30/12 .
All information © 2012 City of Ferndale

Site Use Policy

Site Design/Development by
Bringing the World to Your Corner of the World

Go To Top