FY 2008. Double permit fee for work started without permit. Minimum
permit fee $30.
Sewer Repair Permits
Sewer Repair Permits must be secured at City Hall
Building before work begins (no mail-in sewer repair permits allowed).
Before a Sewer Repair Permit will be issued, all Plumbing/Drainlayer
Contractors shall be required to furnish the City of Ferndale with
the following:
-
Signed, Sealed City of Ferndale Drainlayers Bond
(Original)
-
Signed, Sealed Power of Attorney attached to Bond
(Original)
-
Certificate of Liability Insurance for City of Ferndale
(Original)
All Pavement Cut Permits shall be secure before sawing
begins or be subject to a double fee. (See Engineering Permit
Fees).
All open trenches must be inspected before covering or will be
re-dug for inspection purposes.
Fee Schedule
| Yearly
Registration of Plumbing Contractor |
|
$1.00 |
| Go
To Top |
| Annual
Administrative Fee |
|
$29.00 |
| Go
To Top |
| Fixtures
(Each) |
| Includes: sink (any type),
bath tub, shower trap, water closet, lavatory, laundry
tray, back water valve, drinking fountain or water
cooler, urinal, dishwasher, garbage unit, floor drain,
water heater, back flow preventor, hose bib, humidifier |
$10.00 |
| Catch Basins - drawings
required, handout available |
$30.00 |
| Crock to Iron |
$30.00 |
| Cross Connection Control |
|
Surveyor Application |
$50.00 |
|
Surveyor Renewal Fee |
$30.00 |
|
Tester Application |
$30.00 |
|
Tester Renewal Fee |
$15.00 |
| Dental Chair |
$35.00 |
| Each
Additional Chair |
$15.00 |
| Fire Hydrant |
$35.00 |
| Grease Trap and Interceptors |
$30.00 |
| Inside Drain, Weeping Tile
Trap |
$30.00 |
| Lawn Sprinkler System |
|
|
Sprinkler Heads |
$3.00/each |
|
Backflow Preventor (Mandatory for sprinkler system |
$10.00/each |
| Manhole |
$30.00 |
| Plan Review - refer to
Building Permit Fee Schedule |
|
| Roof Sump |
$30.00 |
| Sewer filming - (may be
refunded if City problem) |
$155.00 |
| Stack, Vent, Conductor and
Drains |
$30.00 |
| Sump with Pumps |
$30.00 |
| Water Treatment Device |
$30.00 |
| Water Heater |
$30.00 |
| Go
To Top |
|
Sewers:
Sanitary, Storm, Combination (not
exceeding 100 feet in length from building to City Sewer) |
| 6" Tap |
$35.00 |
| 8" Tap |
$45.00 |
| 10" Tap |
$55.00 |
| 12" Tap |
$65.00 |
| 15" Tap |
$75.00 |
| 18" Tap |
$85.00 |
| Exceeding 18" Tap |
$115.00 |
| Go
To Top |
| Water
Conservation Equipment |
| 0 - 5 HP |
$35.00 |
| 6 - 20 HP |
$45.00 |
| 21 - 50 HP |
$55.00 |
| 51 - 100 HP |
$65.00 |
| Over 100 HP |
$115.00 |
| Go
To Top |
| Water
Distribution System |
| ¾" Service |
$35.00 |
| 1" Service |
$45.00 |
| 1½ Service |
$55.00 |
| 2" Service |
$65.00 |
| 3" Service |
$75.00 |
| 4" or Over Service |
$85.00 |
| Go
To Top |
| Water
Service from Stop Box to Meter |
| ¾" Service |
$35.00 |
| 1" Service |
$45.00 |
| 1½ Service |
$55.00 |
| 2" Service |
$65.00 |
| 3" Service |
$75.00 |
| 4" or over Service |
$85.00 |
|
|
Go
To Top |
| Water
Taps and Service Changeovers: (fax
water/sewer tap and street cut applications to DPS so
they are aware for inspection purposes) |
| The following
schedule applies to any new construction and to
modification of an existing system. It does not
include Engineering Permits (if required). If a
street cut and subsequent repair are required, an
additional fee of $1,830 will be added to the charges
below. |
| ¾" Water Tap /
Changeover |
$1650.00 |
| 1" Water Tap /
Changeover |
$1680.00 |
| 1½" Water Tap /
Changeover |
$1860.00 |
| 2" Water Tap /
Changeover |
$2075.00 |
| Discontinue Water Service (Permanent water
kill only) |
$650.00 |
|
- If service line (main to box) is lead then it must be changed
to copper. This procedure requires digging up road,
installing copper pipe and new service box.
- If service line (main to box) is copper then the City will
replace the service box without any fee.
Cancellations or Refunds
Upon written request, prior to commencement of any work,
permits may be cancelled and refunded to the holder. The
permit fee less 50% or a minimum of $25, will be refunded. The
balance will be retained by the City of Ferndale to defray administrative costs.
In cases where work has commenced and a request is received to
transfer a permit to another contractor, a minimum fee of $25 shall
be charged for the transfer to defray administrative costs.
Additional fee amounts will be determined by actual documented
administrative costs.
Per DPW
- New construction always includes sewer and water tap.
May need street cut $1,850 for each (water and sewer) unless
using one hole for both. May need water service from stop
box to meter. May need distribution as well.
- Licensed contractor must pull permits for sewer and water
taps.
- Sewer repair that encroaches side walk must have engineering
permit and, if contractor, may use existing Drainlayer Surety
Bond, Power of Attorney, and Insurance. No Concrete Surety
per Engineering Technician.
Government
| Services |
Community
| Business |
Resources
Job Announcements |
Home | Site Map |
Search
The City of Ferndale, Michigan
300 East Nine Mile Road
Ferndale, Michigan 48220
(248) 546-2525
|
Click here to
send your feedback to the City of Ferndale.
This page last modified
06/30/08
.
All information © 2008 City of Ferndale
Site Use
Policy
Site Design/Development by

|
Go
To Top |
|